top of page
PHOTO-2025-12-09-20-33-44 (1) (1).jpg

FULLY INSURED • WRITTEN SCOPE

✅ WALKTHROUGHS • CLEAR DAILY COMMUNICATION

CLEAN JOB SITE HABITS

ELLENWOOD, GA
FIRST-FLOOR TRANSFORMATION:
(PAINT + TILE FLOORING)

We removed failing LVP, corrected a floor that was over 1" out of level, and delivered a clean, durable tile finish—plus drywall repairs, paint prep, toilets, and lighting upgrades.

For Homeowners and Landlords in the Metro Atlanta area.

CLIENT TESTIMONIAL VIDEO

Project: Full Perimeter Fence Painting • Fairburn, GA

Want to hear it straight from the homeowner? Watch a quick walkthrough of what it was like working with J&Z Painting & Remodeling—from communication to quality to the final black semi-gloss finish.

Location: Ellenwood, GA

Timeline: 2 weeks

Client Type: Homeowner

How They Found Us: ChatGPT

Scope: LVP Removal + Floor Leveling + Paint + Fixtures

Project Type: Paint & Floor Installation 

THE STORY

This homeowner wanted a true “reset” on the first floor—starting with the floors. After a bad experience with a previous contractor (poor workmanship and messy results), trust was the biggest hurdle.

 

We earned it the only way that matters: multiple walkthroughs, clear expectations, patient communication, and a clean, professional process. The result was a level, high-end 12x48 tile finish throughout the first floor, with key repairs and upgrades completed along the way.

HOW THEY FOUND US

The customer discovered J&Z Painting & Remodeling through ChatGPT, reached out, and called us for a quote.

From the first conversation, we focused on clarity: what we’d do, how we’d protect the home, how long it would take, and what “done” would look like.

THE CHALLENGE

The floor was over an inch out of level in areas—tile would fail without proper correction

Prior contractor experience made the client hesitant to trust anyone new

Multiple trades involved (flooring, drywall, paint prep, plumbing fixtures, electrical fixtures)

The homeowner wanted a clean, durable, modern look that would hold up long-term

THE PLAN

Walkthroughs + scope confirmation (no surprises, no vague promises)

Protection plan for surrounding areas during demo and leveling work

Floor leveling strategy to create a stable, tile-ready substrate

Large-format tile installation plan (layout, cuts, transitions, consistent lines)

Punch-list mindset for drywall repairs, wall prep, toilets, and fixture installs

Communication cadence: frequent updates + progress check-ins

e13dcaa5-af22-4833-98e8-7f63802417e4.JPG

SCOPE OF WORK

1) DEMO & PREP

  • Removed old LVP flooring

  • Prepped the first floor for leveling and tile installation

3) DRYWALL & WALL PREP

  • Repaired damaged drywall

  • Prepared walls for paint (ready for a clean finish and better adhesion)

2) FLOOR LEVELING & TILE INSTALLATION

  • Leveled floor areas that were over 1" out of level

  • Installed 12x48" tiles throughout the first floor for a modern, seamless look

4) FIXTURE INSTALLATIONS

  • Installed two toilets

  • Installed multiple light fixtures, including a ceiling fan

5) CLEANUP + FINAL WALKTHROUGH

  • Job site cleanup throughout the project

  • Final walkthrough + punch list completion

TIMELINE & PROCESS

Week 1: Demo + Foundation Work + Tiles

LVP removal and surface prep

Floor leveling to achieve tile-ready flatness

Layout planning for large-format tile

12x48 tile installation across first floor

Week 2: Paint + Installations

Drywall repairs and wall prep

Toilet installs + lighting/fan installs

Final punch list + walkthrough

CHALLENGES SOLVED

1) Floor was over an inch out of level
Large-format tile is unforgiving. We corrected the substrate first so the final floor looks right and performs right—no shortcuts.

2) Trust was low because of a previous bad contractor

We didn’t push. We proved. Multiple walkthroughs, clear communication, and a professional process rebuilt confidence step-by-step.

RESULTS

Level, durable tile floor that feels solid underfoot and looks high-end​

Modern 12x48 format gives the first floor a cleaner, more continuous look​

Walls repaired and prepped so the home is ready for a quality paint finish​

 

Toilets and fixtures installed cleanly to complete the refresh

PHOTO-2025-12-09-20-32-46 (1).jpg
PHOTO-2025-12-09-20-33-52 (1).jpg

BEFORE PICTURES:

AFTER PICTURES:

Or tell us about your property and we’ll recommend the right level of refresh for your goals.

Frequently asked questions

bottom of page